Central Government/Public Sector | Maharashtra - India | PID: 190135
|
The Central Railway (CR) will soon get its first multi-level parking lot, with the construction of the structure underway at Thane station. This is in addition to 13 locations CR has identified for pay-and-park spots. The parking lot at Thane station is spread over 1,700 sq mtr area.
While the ground level of the parking space is already in use, the first level is under construction. The parking lot at Thane has a capacity to accommodate over 2,000 vehicles.
The two-storey structure will be managed by the Railways. Mostly two-wheelers are currently parked on the ground level. The top level will be used for mixed vehicles.
The pay-and-park slots are mostly spaces at stations where parking at present is illegal. Mulund West, sites in Navi Mumbai, Bhandup, Kopar, three sites at Kalyan, Byculla East, Panvel, Thane, CSMT outside platform 18, LTT and Thakurli have been chosen for the project. New sites are also being identified at Vangani, Ambernath, Kalyan, and Umbermali.
| Updated on: 02 - Aug - 2019
|
|
|